Home / Smoke and Heat Ventilation Guide

Smoke and Heat Ventilation Guide

This page is a short orientation for designers and operators planning smoke and heat exhaust ventilation systems (SHEVS) for the first time. Always verify the standard, regulation and fire brigade requirements that apply to your project.

What does a smoke and heat exhaust system do?

In a fire, hot smoke forms a layer under the ceiling. The system removes this layer and brings in fresh air from below. Escape routes and the intervention area stay usable for longer, the heat load on the structure is reduced and firefighting is easier. Smoke ventilation is a life and property safety measure designed together with sprinkler systems.

Natural and powered systems

Smoke reservoirs and barriers

Large spaces are divided into smoke reservoirs with smoke barriers or smoke curtains. This keeps the smoke layer from spreading and gives each reservoir its own extraction area. Curtains can be fixed or automatic, dropping on the fire alarm.

The EN 12101 standard series

In Europe the components of smoke and heat control systems are defined by the EN 12101 series. The main parts are:

Part Subject
EN 12101-1 Smoke barriers
EN 12101-2 Natural smoke and heat exhaust ventilators
EN 12101-3 Powered smoke and heat exhaust ventilators
EN 12101-6 Pressure differential systems
EN 12101-7 Smoke duct sections
EN 12101-8 Smoke control dampers
EN 12101-10 Power supplies

The status of the standard differs from part to part. For CE marking and declaration of performance, check the current edition of the relevant part.

Design steps

  1. Classify the building: single-storey industrial, with mezzanine, high-racked storage or enclosed car park.
  2. Choose the fire scenario: fire size, heat output and the effect of sprinklers set the smoke production.
  3. Define the smoke reservoirs: barriers and reservoir areas.
  4. Choose the clear layer height: the height kept free of smoke for escape and intervention.
  5. Calculate the extraction area and number of devices: use the standard and official design guides.
  6. Allow for make-up air and wind effects.
  7. Design controls and power: alarm interface, control panels, power supplies and commissioning tests.

For design methods you can refer to national and international guides (for example BS 7346-4 and CEN/TR 12101-5). Verify the current editions.

Contact us

For product selection and technical support: smoke and heat extraction systems, Mercor brand, contact, +90 216 327 85 05, info@teknoyangin.com.tr.

Contact Us
WhatsApp