In an earthquake, shaking makes sprinkler pipe sway relative to the building and strains hangers and pipe. Seismic bracing makes the piping move together with the structure it hangs from, so the system stays intact and can keep working after the event.

Why bracing matters

Seismic provisions aim to avoid significant damage to sprinkler systems and keep them functional. A study of 973 sprinklered buildings in the 1971 San Fernando earthquake found that if a sprinklered building fared well, so did its sprinkler system. Lessons from the 1971, 1989 (Loma Prieta) and 1994 (Northridge) California earthquakes shaped later NFPA 13 revisions; a lack of longitudinal bracing is cited as a common condition linked to leakage after Northridge.

Three kinds of brace

What gets braced

Spacing limits quoted by published summaries

Verify. These figures come from summaries of the 2019 edition. Edition, local code and the authority having jurisdiction decide what applies to your building.

Zone of influence and brace load

Each brace carries the load from the pipe in its zone of influence, which generally extends to the midpoint between adjacent braces. The seismic load is based on the weight of the water-filled pipe times a seismic coefficient; where the site value is not known, a default coefficient of 0.5 is used. A brace is sized as an assembly, so its weakest component governs, and its capacity falls as the angle approaches vertical.

Cable or rigid?

Braces must attach to structure that can take the extra seismic force. The whole assembly must be listed for its maximum load, and C-type clamps cannot be used to attach braces.

Flexibility and clearance

Bracing handles inertial sway. Differential movement between parts of a building is handled by flexible couplings, seismic separation assemblies and clearance. Pipes 1 to 3.5 in. need penetration holes 2 in. larger than the pipe; pipes 4 in. and larger need holes 4 in. larger. Clearance is not needed through frangible construction without a fire rating, but is required where the construction is a fire barrier.

Branch line restraint

Branch lines need less than full bracing. Accepted methods include listed sway brace assemblies, wrap-around U-hooks and No. 12 wire rated at 440 lb.

Related pages

See our seismic sway bracing and FM-approved seismic pipe hangers pages, the seismic bracing selector and the 3D brace demo.

Sources

Summary for orientation only. Verify every value against the current edition of the standard and the manufacturer listing, and involve the authority having jurisdiction. This note does not replace a design by a qualified engineer.

← Technical Library

Need help with your project?

Contact Us
WhatsApp